Deputation to Development Management Committee - Monday 20 September 2010

Thanks go to all the elected members who asked a number of probing questions of the council officers. The planning application was approved and the project board has convened several times since to progress these plans.

We thought it might be of interest to share the text of the deputation presented by Mr Kiran Oza to the Development Management Committee on 20 September 2010.

Note that the first point raised by this deputation didn't need to be raised as the director of city development, Mr Mike Galloway, stood up first to apologise for an oversight in recording the application as 'local' rather than 'major', but claimed that in all other respects the application has been processed as if it were a major planning application....
"Lord Provost, Depute Lord Provost, Convener, Councillors: thank you for the opportunity to address the committee today. I have 7 points to make, each of which addresses a material consideration in respect to planning.

1. First of all, there is a 'Major' flaw in the report by the director of city development.

This planning application (10/00406/FULL) has been classed as a 'Local' planning application, which is contrary to The Town and Country Planning (Hierarchy of Developments) (Scotland) Regulations 2009. Regulation 2(1) states in paragraph 9 of the description of development that where "The gross floor space of any building, structure or erection constructed as a result of such development is or exceeds 5,000 square metres", shall be categorised as a "major development". Circular 5 2009 Hierarchy of Developments advises that education developments of projects fall under paragraph 9 of the regulation and also stipulates "there is no scope for local interpretation of what constitutes a major development or a local development either by planning authorities...individuals...or other stakeholders in the planning system."

The planning application before you states that the proposed floor space for this non-residential development for School Education is 5,600 sq.m., which exceeds the 5,000 sq.m. stipulated in the regulations and therefore should be classed as a 'Major development'.

What is the impact of this error? My second point...

2. As a result of this error, the objection that "pre-application consultation was not carried out appropriately" could not have been given due consideration since the director's report incorrectly claims, "As this is not a defined major application there is no statutory requirement for preapplication consultation." Similarly, the case officer may not have fully scrutinised the statutory requirements, such as the Design and Access Statement, since the report also claims, "There was not a mandatory requirement to submit a Design and Access Statement for this development."

3. From the early days of this project, including the previous director of education's proposal to the Education Committee in January 2009 (report 69-2009), through subsequent consultations and meetings, to both versions of the planning application form (the one with the council owning the land, and the 'corrected' version stating that Foxmead Ltd is the current owner), the site size has been 1.27 hectares, in other words 12,700 sq.m.

Miraculously, in the Design and Access Statements (again there were two variants of this), the site has grown to 1.35 hectares, in other words 13,500 sq.m., and this is repeated in the report before you today.

From where has this additional 800 sq.m. appeared? If it is indeed the correct area, then it has a material impact on this acknowledged "tight site" and makes a difference to the range of possible designs. For example, if it is adjacent to the proposed 600 sq.m. multi-surface outdoor playing area, adding 800 sq.m. makes this a much more viable proposition to parents and others who wish for good outdoor provision for the children of this new school.

4. The inclusion of a formal consultation with Sportscotland is not material to this development and should not be included in the director's report. Sportscotland are a statutory consultee only if there is will be a loss of playing field provision in excess of 0.2 hectares (2000 sq.m.). In written correspondence with Sportscotland on 21 April 2010, the council states, "the former blaes pitch adjacent to St Joseph's Primary has not actually been used as a sports pitch for at least 20 years."

If this is the case, then there is not a loss of playing field of 0.2 hectares or more, and Sportscotland should not have been consulted not should their views have been included in the director's report today.

If the area has indeed been used as a sports pitch in more recent times, as attested to by:
  • the fact that satellite imagery (Google Earth, DD1 5HX, historical imagery for Dec 2001) over the last 10 years shows football goalposts at either end of this 'car park',
  • the fact that the school has until very recently held its annual Sports Day on this pitch,
  • the fact that the children of St Joseph's enjoy both football training and cross country training on this pitch,
then Sportscotland may well revert to their previous intimation of 16 March 2010 that they would be likely to object to planning. In the same correspondence, Sportscotland proposed that a 60m x 40m Synthetic Turf Pitch on the St Joseph's blaes pitch "may be a better alternative to Victoria Park. The site is enclosed therefore it would be easier to monitor the children."

Consider also that the proposal by the Council for a 600 sq m synthetic pitch for 430 pupils is a mere 25% of the minimum size synthetic pitch that is recommended by SportScotland for schools of this size.

In case you are wondering that is 1.4 sq m per child.

5. Regarding the potential noise from the proposed buildings, the director's report notes the Noise Impact Assessment, which considers the potential impact any noise from any mechanical plant serving the schools may have on residents in the vicinity. This NIA concludes that any noise would fall within the NR25 and NR35 requirements. However, it is clear from the report submitted that the plant proposed can not satisfy this condition. How could the report come to the conclusion it has on the basis of the information provided. Does the noise condition (9) not contradict the conclusion in the report, if not then the condition would not be required!

In addition, this completely fails to take into account the noise impact of children playing in the playground and the multi-surface 5-a-side pitch. Some 430 primary children and upwards of 70 nursery children will be outdoors during playtimes and lunch breaks. Even if these are staggered to accommodate pupil numbers in the outdoor space and dining hall facilities, the noise level, though less, will be for a longer duration. It may surprise those present to consider how modern legislation can curtail the ability of children to play boisterously outside as was recently reported in Barlby Primary School.

Also, the recent planning application by the High School of Dundee, 10/00397/FULL, was refused on the premise that it would have:

"an adverse impact upon the level of environmental quality afforded to neighbouring residents by virtue of noise disturbance from the use of the all weather pitches, road safety from increased traffic, light pollution from the proposed flood lights and visual amenity due to the appearance of the proposed flood lighting columns and fencing."

The proposals were therefore deemed "contrary to the requirements of Policy 1 (Vibrant and Sustainable Communities) of the Dundee Local Plan Review 2005."

It is presumed that the same material consideration will be given to the planning application before you today.

6. The report compiled by Scottish and Southern Electricity found that the site is not currently affected by electro-magnetic fields. However is it not the case that EMF can be attracted and thus the danger here is that the building and internal electrical equipment will attract and even amplify the EMF from the adjacent electricity substation?

7. The conditions attached provide for an investigation of the contamination present on the site. This is an acknowledgement that the site is contaminated. Is it therefore wise of to approve a school on the site prior to knowing what contamination is present on the site? If this application is moved for approval, the decision should state that a condition of the approval is that the excambion must not proceed until conditions 2 and 3 are satisfied."

Wednesday, September 15, 2010

Planning application to be decided 20 Sep 2010

The proposed West End schools' planning application is finally to come before Development Management Committee on Monday 20 September 2010.

The report, which recommends the planning application for approval, can be read on the council website at: http://www.dundeecity.gov.uk/reports/agendas/dm200910.pdf

If the application is approved by our elected members, then the St Joseph's car park and green spaces could be transferred to Al-Maktoum Foundation ownership soon after.

Where will parents, teachers and church parishioners park and where will the children play, during and after school?





Tuesday, August 17, 2010

Janny's folly?

As reported on this blog, the council's deadline for comments on its planning application for the new west end school was extended to 16 August 2010, perhaps in part because the application was updated to admit that the land is owned by Foxmead Ltd (Jersey) rather than by the council, as originally claimed.

It seems that a related application to demolish the janitor's hut on the Logie site was also incorrectly completed. It has also been updated (06 August) indicating that Foxmead Ltd (Jersey) own this land; the application had previously claimed that the council was the only owner of the land.

Was this another administrative error?

Why has the deadline for comments not been similarly extended for this application?

If this application is to be determined by 23 August, why did it not appear in the agenda/reports for Development Quality Committee yesterday (16 August)?

Why does this renewed application state there will be no car parking spaces after development, when the corresponding application for the new school clearly states there will be 49 car parking spaces - is this yet another administrative error?

Friday, July 30, 2010

Expiry date for planning application 10/00406/FULL extended to 16/08/2010

Due to submission of a modified planning application (10/00406/FULL) on 26/07/2010 with an amendment to the Land Ownership Certificate, the overall expiry date of the application has been extended to 16 August 2010, with a target determination date now set at 25 September 2010. The original application was completed with Certificate A, claiming:
"no person other than *myself/the applicant was an owner (Note 2) of any part of the land to which the application relates, at the beginning of the period of 21 days ending with the date of this application..."
The modified application has been completed with Certificate B, stating:
"The applicant has served notice on every person other than the applicant who, at the beginning of the period of 21 days ending with the date of the accompanying application was owner (Note B) of any part of the land to which the application relates."
The persons to whom this notice was served are stated to be 'Foxmead Ltd'.

Why was the original application completed using Certificate A, which should be done
"...where the applicant is the only owner and the land is not an agricultural holding" (Note 1)?
Was this an administrative error?

Was it in response to public scrutiny using objections lodged based on
our proforma letter?

Why did Dundee City Council claim to be "the only owner" of land it
sold to the Al-Maktoum Foundation in 2004?

The details of the excambion of land are being withheld from the public, and the "urgent" council meeting held on 22 February 2010 excluded members of the public and the press. Isn't it about time that the full facts surrounding these negotiations were disclosed so that the public can be assured this is in the best interest of the public purse?

Thursday, July 8, 2010

Proforma objection to the planning application 10/00406/FULL

We have drafted a proforma letter of objection for anyone wishing to use some or all of this information. If you wish to use this, you can download in Word or PDF format and submit to the Director of City Development by 15 July 2010. Remember to include your name, address and signature.


Proforma objection to planning application 10/00406/FULL

Wednesday, July 7, 2010

Electronic survey field test results for Logie site

The city council's planning application (10/00406/FULL) includes an Electronic Survey Document regarding field tests conducted by Scottish and Southern Energy (Report-285685.PDF), and which reports readings of 0 (zero) microtesla at various points on the Logie site.

We asked Alasdair Philips, from EMFields and Powerwatch, to comment on this report:
The "0" microtesla is a nonsense. There is no way it can be zero. It may well be low, but on a 0.00 resolution scale (the usual one measuring to 0.01 microtesla) I would expect between 0.01 to 0.10 at least. I suspect the site is fine for the school, but they should not get away with such a document.

Also, the 50 microtesla "natural fields" level statement is inexcusable - that is a static (permanent magnet) field and cannot be compared with a 50 Hz oscillating field. I thought the industry had got away from such stupid statements - apparently not Scottish and Southern. I will send this report to some senior electricity industry people for comment. The background ELF oscillating field is actually less than 0.0001 microtesla - compare that with 50!
The SSE report is presumed to be the council's response to the HMIe recommendation: "The council should also seek to reassure parents about the levels of contamination of soil at the proposed site and the level of danger from the nearby electricity sub-station", as quoted in section 6.2 of HMIE report dated November 2009.

Unfortunately, if the report is as inaccurate as suggested by Mr Philips' comments, it gives parents no such assurance.

Playtime at the new West End school?




We were wondering what playtime at the new West End school might be like, so we took one of the sketches from the council's planning application 10/00406/FULL, as viewed from the south-east corner, and added 400 children using the council's sketch of 4 children playing as a stamping tool.

Here's what we discovered, before and after modification. What do you think? What will the noise levels be for residents and nearby businesses? Will the children have enough space to play - or even move?